VISY PAPER MILL ALBURY

Visy Paper Mill Albury
Visy Paper Mill Albury
Visy Paper Mill Albury
Visy Paper Mill Albury
Visy Paper Mill Albury

NorthCE designed for the removal of the existing air handling system serving the roller grind workshop at the Albury site, from the main building chilled water and steam-based heating water system and provide an independent standalone cooling and heating system to serve this space.

The design included options for gas fired absorption boilers and air-cooled chillers, as well as reverse cycle chillers.

Commenced: 2020

Client: TVH/Visy

Engineering Services Performed: Mechanical and Electrical Engineering

Engineering Performed By: NorthCE